A-C Board seeks bids for air conditioning

A-C Central school district is putting out for bids a project to replace HVAC units in the Ashland campus that have either quit working or otherwise malfunctioned. The units will be replaced over time starting with the two that are not working. The motion was passed at last week’s meeting of the school board.
Superintended Tim Page said the troublesome units are considered top of the line and every engineer he has spoken is surprised A-C is having trouble. He said they theorize the installation was done incorrectly.

  To view more, please log in or subscribe to the digital edition.